Crack Repair: What Gets Cut Out and What Gets Covered
A crack filled as it is will bridge rather than bond, and it reopens through your new coating in about one freeze-thaw season. Cracks get chased out with a saw into a clean channel 1/4 inch wide, filled with a rigid polyurea or epoxy repair resin, and ground flush. That is roughly $3 to $12 per linear foot.

The part that matters is the chasing. Everything else is filler.
Why can you not just fill the crack?
Because a crack is narrow at the top and irregular all the way down, so filler pushed into it sits in the opening like a wedge. It touches both faces near the surface and touches almost nothing below. There is no bonded area.
Chase it out and you get a channel with two parallel faces and a flat bottom. Now the repair material has real surface to bond to on both sides, and it is thick enough to have strength of its own rather than being a skin.
A crack chaser is a small angle grinder with a purpose made blade. It takes minutes per foot and it is the whole difference between a repair that holds and a line that reappears.
Which cracks matter?
| Crack type | What it is | Treatment |
|---|---|---|
| Hairline shrinkage | The slab curing, under 1 mm | Chase and fill rigid |
| Settlement crack | Ground movement, may have a height step | Assess first. A step means the slab moved. |
| Control joint | A deliberate saw cut | Fill semi-rigid, or honour it through the coating |
| Cold joint | Where two pours met | Chase and fill, expect it to telegraph slightly |
| Structural crack | Wide, through depth, displaced | Not a coating problem. Needs an engineer. |
The distinction that decides the job is whether the crack is static or moving. A shrinkage crack from the concrete curing is done moving and can be filled rigid. A crack that is still opening and closing with temperature needs a flexible joint treatment, or it will simply tear the repair.
You can tell by looking at the edges. Clean sharp arrises mean it cracked once and stopped. Rounded, worn or spalled edges mean it has been working for years.
Crack count is a real part of the price, which is why it is measured on site rather than guessed from a photo.
Get it measuredWhat about control joints?
Those are the straight saw cut lines in the slab, put there deliberately so the concrete cracks where somebody chose rather than at random. They are doing a job and they keep doing it after you coat.
Two options. Honour the joint, which means filling it with a semi-rigid filler and letting the coating crack along that line where it is meant to. Or fill and coat straight over, accepting that it will probably telegraph through as a hairline eventually.
In a garage I usually fill and coat over, because a garage slab is small and the joints rarely move much. In a warehouse I honour every one of them, because a 40,000 square foot floor moves measurably and a coating fighting that will lose.
What does a bad repair look like a year later?
A raised line. The repair material shrank or was proud of the surface and never got ground back flush, so you can feel it underfoot and see it in raking light.
Or a dark line, where the repair was done but the coating over it is a slightly different thickness because the surface was not flat. Both are cosmetic and both are avoidable by grinding the repair flush before the primer goes on, which takes a few minutes per crack and gets skipped when somebody is in a hurry.
What about a crack that is still moving?
Then it gets treated as a joint rather than as a crack, and the material changes. A rigid polyurea in a moving crack tears, usually within a year, and leaves a line that looks worse than the original because now it has a torn edge.
A semi-rigid or flexible filler lets the two sides move a little without failing. The trade-off is that a flexible filler is softer than the floor around it, so under wheel traffic it can deform and leave a slight depression. On a warehouse that is a known compromise and it is the right one.
Telling a moving crack from a settled one is a judgement, and the honest position is that sometimes you are wrong. We filled a crack rigid in a Liberty shop floor that looked completely settled, and it opened again the following February. We cut it out and redid it flexible at our own cost. Now anything running parallel to an exterior wall gets treated as moving unless there is a good reason to think otherwise, because that is where the temperature swing is.
Where does this cost the most?
Older housing stock. A basement slab in Independence poured in 1961 has had sixty winters to move, and it is normal to find 30 to 50 linear feet of crack in a 700 square foot lower level. At $3 to $12 a foot that is a real line on the quote and it is the item most likely to surprise somebody who was expecting a flat square footage rate.
A 2018 slab in Olathe might have two hairlines and a control joint. Same room size, very different repair bill, and it is entirely about when the concrete was poured.
This is why a quote given over the phone is a guess. Nobody can count cracks from a photograph, and the count is a real part of the price.
Basement flooring covers where this matters most, and install day shows where the repair sits in the sequence.
What to do next
Older slabs need more repair. That is normal and it gets priced honestly. Send the space through the form on this page and Glen calls you back, usually the same working day. He measures on site before anything is final, so the number you get is fixed rather than a range. Or call 816-500-1161, Monday to Friday 7am to 6pm.
Tell us the space. We will price it.
Four questions about the floor, then your details. Glen reads every one of these himself and comes out to measure before anything is final.
- Free, no obligation estimate
- Measured on site, not guessed
- Residential and commercial
- Missouri and Kansas
-
01
You send the space
Type, rough size and what it is used for.
-
02
Glen calls back
Usually the same working day, from the number below.
-
03
He measures on site
Then you get a fixed price, not a range.
Would rather talk it through? Call 816-500-1161, Monday to Friday 7am to 6pm.
Request a Quote
Takes about a minute.