Empty the space completely, arrange parking for about 5 days, and cover anything behind the door into the house. That is 30 minutes of work that saves an hour of ours, and the hour is on your invoice either way.

Here is the whole list, in the order it matters.
What has to come out?
Everything. Not "most things". A floor job needs the entire slab accessible, including the two feet behind the shelving and the corner where the paint cans live.
The items people forget are consistent enough to list. Wall mounted shelving that sits close to the floor. The chest freezer, which needs emptying or a long extension lead run somewhere else. Bags of salt or fertiliser, which have usually welded themselves to the concrete. And the thing behind the thing, which everybody has.
| Before the day | Why |
|---|---|
| Empty the space completely | The whole slab has to be accessible |
| Move or empty a chest freezer | It cannot sit on the floor and it cannot lose power |
| Unbolt low wall shelving | The grinder and edger need the perimeter |
| Sort parking for 5 days | Vehicles are the last thing back on the floor |
| Cover items behind the shared door | Dust finds gaps even when the door is taped |
| Replace a perished door seal | Stops grit and meltwater running onto the new floor |
| Note any drain, trench or anchor | These get detailed rather than discovered |
Where does it all go?
The driveway is normal and it works, with a tarpaulin over it if rain is forecast. A rented storage pod is the tidy option for a big garage and costs less than most people assume.
What does not work is moving it into the house, if there is a shared door. That door gets taped and sealed for the dust, and it stays that way for the grinding day.
What about the cars?
Plan for 5 days off the floor. Foot traffic comes back the next morning, but vehicles are 3 to 5 days after the topcoat and longer in cold weather.
If you have one driveway and two cars, talk to a neighbour before the week arrives rather than on the morning. Street parking rules vary across this metro and a ticket on day three is an avoidable annoyance.
What should I sort out with the installer?
| Ask before the day | What a good answer sounds like |
|---|---|
| How are you controlling dust? | Shrouded grinder, vacuum at the head, door sealed |
| What are the three cure times? | Foot traffic, light items, vehicles, in writing |
| What happens if the moisture test is high? | The primer changes, here is what it adds |
| What is the weather plan? | We move the day rather than chase the cure |
| Who moves what is in the garage? | Agreed in advance, not on the morning |
The cure times are the ones to get in writing. Foot traffic, light items, vehicles. Those are three different numbers and a household planning around the wrong one is how a fresh floor picks up its first mark.
What about the dust?
Ask how it is controlled. The answer should include a shrouded grinder, a vacuum at the head, and sealing the door into the house. On an attached garage we also run air out of the space, which keeps the pressure lower inside the garage than inside the house so dust does not drift in.
Even done properly, put dust sheets over anything in the room on the other side of that door. Garage doors are rarely as well sealed as people think, and we learned that in a Parkville house where the door looked fine and the utility room behind it did not, afterwards. We paid for that clean. Now we tape and we warn, every time.
What about pets and people?
Plan to be out of the house for the afternoon of the coating day, and take the dog with you.
The smell during application is strong, and it is stronger with a polyaspartic than with an epoxy. It clears within a few hours because the material cures fast, so the exposure is short rather than lingering, and being out for an afternoon covers it comfortably.
Cats matter more than people expect. A cat that gets into a garage overnight and walks across a curing floor leaves prints that are permanent, and it has happened to us twice. Both times the owner was certain the cat could not get in.
Anything else that saves time?
Three things. Leave a power outlet accessible, because grinders and vacuums need it and an extension run from the kitchen is nobody's idea of a good day. Mention any floor drain or trench before the crew arrives rather than when they find it. And if there is a mounted rack, a lift or anything bolted through the slab, say so at the quote, because anchors get dealt with before the coating rather than drilled through it afterwards.
One more. If your garage door seal is perished, now is the moment to replace it. It is a $30 part, and the alternative is meltwater and road grit running under the door onto a brand new floor every January.
Install day hour by hour covers what happens once we arrive. The garage floor page has the build, and contact is where to start if you want it measured.
What to do next
You get a written prep sheet with the quote. Send the space through the form on this page and Glen calls you back, usually the same working day. He measures on site before anything is final, so the number you get is fixed rather than a range. Or call 816-500-1161, Monday to Friday 7am to 6pm.
Tell us the space. We will price it.
Four questions about the floor, then your details. Glen reads every one of these himself and comes out to measure before anything is final.
- Free, no obligation estimate
- Measured on site, not guessed
- Residential and commercial
- Missouri and Kansas
-
01
You send the space
Type, rough size and what it is used for.
-
02
Glen calls back
Usually the same working day, from the number below.
-
03
He measures on site
Then you get a fixed price, not a range.
Would rather talk it through? Call 816-500-1161, Monday to Friday 7am to 6pm.