To stop the slab degrading
Bare industrial concrete dusts, spalls and absorbs everything spilled on it. Once it starts breaking up, the repair is far more expensive than the coating would have been.
Heavy duty, impact resistant systems for forklifts, machinery, storage racking, loading docks and high traffic production areas.
A loaded forklift puts its whole weight through four small contact patches and then turns on them. Racking legs concentrate tonnes onto plates the size of a hand. A pallet dropped from a fork hits one corner first. None of that is what a decorative coating is designed for.
Industrial systems are built heavy at the base coat, where the impact is absorbed, and finished with a topcoat chosen for the chemicals and the traffic. The decorative stage is where safety markings go in, not where the floor is made pretty.
Appearance is nowhere on this list, which is the difference from every other category on the site.
Bare industrial concrete dusts, spalls and absorbs everything spilled on it. Once it starts breaking up, the repair is far more expensive than the coating would have been.
Pedestrian walkways, forklift lanes and exclusion zones, laid into the floor where they cannot be scuffed off.
A sealed floor can be swept and scrubbed. A dusting slab cannot, and the dust ends up in the product and in the machinery.
The client’s own specification, from their commercial process.
One hundred percent solids epoxy, specified for forklifts, machines, chemicals, impact and abrasion.
Where maximum abrasion resistance and grip are needed underfoot.
Walkways, bays and exclusion zones marked during the decorative stage.
Where the process puts specific chemicals on the floor.
At dock edges, wash areas and anywhere the floor gets wet.
Against wear, UV, chemical spills, tyre marks and temperature swings.



On an industrial floor the preparation is most of the job, most of the time and most of the cost.
Shot blasting is the usual choice on a large industrial slab: it profiles quickly and leaves the mechanical key a heavy build needs.
Industrial slabs are full of them, and every one is a place the new floor will fail first if it is coated over instead of repaired.
Contamination has to come out of the concrete, not be sealed under the new floor.
Tested before a system is chosen, and levelled where the slab has worn into ruts along the traffic routes.
Glen stands behinds his work Always reasonable professional I would highly recommend glen and his team anyday my floors look brandnew After being done 3 years ago

Most projects are completed in 1 to 3 days, depending on the size of the space, the condition of the concrete and the system being applied. You get a timeline with your free estimate, before anything starts.
Yes, but the prep is what decides it. We assess the slab and carry out crack repair, diamond grinding and joint filling as needed so the coating bonds to sound concrete rather than to whatever is sitting on top of it.
With proper surface prep and professional installation, 10 to 15 years or longer, even in high traffic commercial environments.
Very little. Dust mop it and wet mop it occasionally. It resists stains, chemicals and moisture, so there is no sealing or stripping to keep up with.
The whole Kansas City metro on both sides of the state line, including Overland Park, Olathe, Parkville, Lee's Summit, Independence, Liberty, Blue Springs, Kearney, Excelsior Springs and St Joseph.
Four questions about the floor, then your details. Glen reads every one of these himself and comes out to measure before anything is final.
Type, rough size and what it is used for.
Usually the same working day, from the number below.
Then you get a fixed price, not a range.
Would rather talk it through? Call 816-500-1161, Monday to Friday 7am to 6pm.
Takes about a minute.
Free estimate, on site, from the owner.