School and education

Floors specified for a maintenance budget, not a brochure

Durable, low maintenance flooring for classrooms, hallways, cafeterias, locker rooms and common areas.

The building

In a school the running cost is the specification

A school floor is walked on by hundreds of people a day in two concentrated bursts, and it is maintained by a small team on a fixed budget. Vinyl composition tile is cheap to lay and then needs stripping and re-waxing on a cycle for the rest of its life, which is where the real money goes.

A resin floor is more to install and then costs almost nothing to keep: mop it, and that is the routine. Over a fifteen year horizon that is usually the whole business case.

  • No stripping and no re-waxing cycle
  • Seamless, so nothing lifts at the joints
  • Anti slip at the entrances
  • Installed in the summer break
Long hard wearing coated floor running down a wide corridor
2004Installing since
Where it goes

Three parts of a campus that suit it

Not every room in a school should be resin. These three almost always should.

Hallways

The highest traffic surface in the building, and where tile joints and wax lines show the fastest.

Cafeterias

Food, drink and a wet mop twice a day. Seamless and non porous is the right answer.

Locker rooms

Permanently wet, cleaned aggressively, and the highest slip risk on the site.

The case for it

Why facilities teams move to it

Every one of these is a line in somebody’s annual budget.

No stripping cycle

The recurring cost of VCT disappears entirely.

Less contractor access

No overnight crews in the building on a schedule.

Slip resistance

Specified at entrances, cafeterias and wet areas.

Nothing porous

Relevant in a building that shares everything.

Wayfinding colour

Zoning and colour laid into the floor rather than signed on the wall.

Summer install

Scheduled into the break so nothing disrupts term time.

Recent work

Floors like this one

Long hard wearing coated floor running down a wide corridor
Long hard wearing coated floor running down a wide corridor
Training floor with a dark flake resin surface and loaded equipment
Training floor with a dark flake resin surface and loaded equipment
Quiet corridor with a seamless light resin floor and daylight at the far end
Quiet corridor with a seamless light resin floor and daylight at the far end
Scheduling

Working to a school calendar

There is one real window a year, and everything is planned backwards from it.

2004Installing since
1-3Days on site
10-15Year lifespan
Request a Quote
01

Booked against the break

Summer, and sometimes a long weekend for a single area. The schedule is agreed months ahead because the window does not move.

02

Phased by block

A wing or a floor at a time, so if anything overruns it does not stop the building opening.

03

Old tile and adhesive

Lifting VCT and removing the adhesive bed is often the biggest part of the job. It is priced honestly rather than discovered on site.

04

Handover before term

Cure times are planned so rooms are equipped and cleaned with days to spare, not hours.

What a customer said

I would really suggest this company and their guys. They do quality work and lasting work. Really consider this company for flooring jobs

K
Kalyne Spears Google review
Questions

School flooring questions

Training floor with a dark flake resin surface and loaded equipment
Ask Glen directly 816-500-1161 Monday to Friday 7am to 6pm Request a Quote
Instant quote

Tell us the space. We will price it.

Four questions about the floor, then your details. Glen reads every one of these himself and comes out to measure before anything is final.

  • Free, no obligation estimate
  • Measured on site, not guessed
  • Residential and commercial
  • Missouri and Kansas
  1. 01

    You send the space

    Type, rough size and what it is used for.

  2. 02

    Glen calls back

    Usually the same working day, from the number below.

  3. 03

    He measures on site

    Then you get a fixed price, not a range.

Would rather talk it through? Call 816-500-1161, Monday to Friday 7am to 6pm.

Request a Quote

Takes about a minute.

Get the floor measured this week

Free estimate, on site, from the owner.