Concrete dust
An uncoated slab sheds fine dust constantly under wheel traffic. It gets into product, packaging and machine bearings, and in a food or electronics environment it is a compliance problem.
Heavy duty and impact resistant, built for forklifts, machinery, storage racking, loading docks and high traffic production areas.
Traffic in a warehouse follows fixed routes: dock to aisle, aisle to pick face, pick face to despatch. Within a couple of years those routes are visibly worn while the floor under the racking is untouched, and once the surface is through, the slab starts going quickly.
The answer is a heavy base build through the lanes, a topcoat chosen for abrasion, and markings laid into the floor so the routes stay where you put them instead of migrating as the paint wears off.
All three are expensive and all three are slow, which is why they get ignored until they are not.
An uncoated slab sheds fine dust constantly under wheel traffic. It gets into product, packaging and machine bearings, and in a food or electronics environment it is a compliance problem.
Expansion joints and cracks break down first under hard wheels. Once an edge goes, every pass makes it worse.
Painted walkway lines wear off in the exact places they matter most. Laid into the floor, they stay.
Specified around the equipment that runs on it rather than around square footage.
Base coat thickness set by the traffic, not by the area.
Expansion joints filled and armoured so hard wheels stop breaking the edges.
Pedestrian routes, forklift lanes and exclusion zones in the floor itself.
The system is chosen knowing where the legs land and what they carry.
The highest risk metre in the building gets heavy anti slip texture.
A surface a ride-on scrubber can actually clean, at speed.



A warehouse cannot stop, so the work moves through it a bay at a time.
Racking is emptied and worked one run at a time, so the operation keeps picking around the work.
The dock is the busiest and most constrained area. It is usually done overnight or at a weekend.
Where the floor has to go under the legs, that is planned and sequenced rather than coated around.
Foot traffic, then pallet trucks, then loaded forklifts. You get those three timings before the schedule is set.
Glen stands behinds his work Always reasonable professional I would highly recommend glen and his team anyday my floors look brandnew After being done 3 years ago

Most projects are completed in 1 to 3 days, depending on the size of the space, the condition of the concrete and the system being applied. You get a timeline with your free estimate, before anything starts.
Yes, but the prep is what decides it. We assess the slab and carry out crack repair, diamond grinding and joint filling as needed so the coating bonds to sound concrete rather than to whatever is sitting on top of it.
Yes, in sections. Aisle by aisle with the racking emptied a run at a time is the normal approach, and the dock usually gets done out of hours.
That is what the base build is specified for. Tell us the truck weights and the traffic pattern and the system follows from that.
Yes, and it is one of the main reasons warehouses coat a floor. The markings go into the floor during the decorative stage, so they do not wear off the way painted lines do.
Four questions about the floor, then your details. Glen reads every one of these himself and comes out to measure before anything is final.
Type, rough size and what it is used for.
Usually the same working day, from the number below.
Then you get a fixed price, not a range.
Would rather talk it through? Call 816-500-1161, Monday to Friday 7am to 6pm.
Takes about a minute.
Free estimate, on site, from the owner.