Warehouse

The floor a forklift spends all day turning on

Heavy duty and impact resistant, built for forklifts, machinery, storage racking, loading docks and high traffic production areas.

The building

Warehouse floors wear in lanes, not evenly

Traffic in a warehouse follows fixed routes: dock to aisle, aisle to pick face, pick face to despatch. Within a couple of years those routes are visibly worn while the floor under the racking is untouched, and once the surface is through, the slab starts going quickly.

The answer is a heavy base build through the lanes, a topcoat chosen for abrasion, and markings laid into the floor so the routes stay where you put them instead of migrating as the paint wears off.

  • Heavy base build through the traffic lanes
  • Point load tolerant under racking legs
  • Walkways and forklift lanes laid into the floor
  • Dock edges given anti slip texture
Coated warehouse floor running to a vanishing point between tall pallet racking
1-3Days on site
What it prevents

Three failures a coated warehouse floor stops

All three are expensive and all three are slow, which is why they get ignored until they are not.

Concrete dust

An uncoated slab sheds fine dust constantly under wheel traffic. It gets into product, packaging and machine bearings, and in a food or electronics environment it is a compliance problem.

Spalling at the joints

Expansion joints and cracks break down first under hard wheels. Once an edge goes, every pass makes it worse.

Faded markings

Painted walkway lines wear off in the exact places they matter most. Laid into the floor, they stay.

Specification

How a warehouse floor is put together

Specified around the equipment that runs on it rather than around square footage.

Forklift rated build

Base coat thickness set by the traffic, not by the area.

Joint treatment

Expansion joints filled and armoured so hard wheels stop breaking the edges.

Lane and walkway marking

Pedestrian routes, forklift lanes and exclusion zones in the floor itself.

Racking point loads

The system is chosen knowing where the legs land and what they carry.

Dock edge grip

The highest risk metre in the building gets heavy anti slip texture.

Scrubber friendly

A surface a ride-on scrubber can actually clean, at speed.

Recent work

Floors like this one

Coated warehouse floor running to a vanishing point between tall pallet racking
Coated warehouse floor running to a vanishing point between tall pallet racking
Heavy duty coated floor in a wide industrial bay
Heavy duty coated floor in a wide industrial bay
Independent mechanic workshop with a two post lift over a coated floor
Independent mechanic workshop with a two post lift over a coated floor
Keeping the warehouse running

Doing it without stopping despatch

A warehouse cannot stop, so the work moves through it a bay at a time.

2004Installing since
1-3Days on site
10-15Year lifespan
Request a Quote
01

Aisle by aisle

Racking is emptied and worked one run at a time, so the operation keeps picking around the work.

02

Dock areas out of hours

The dock is the busiest and most constrained area. It is usually done overnight or at a weekend.

03

Racking lifted where needed

Where the floor has to go under the legs, that is planned and sequenced rather than coated around.

04

Cure timed to traffic

Foot traffic, then pallet trucks, then loaded forklifts. You get those three timings before the schedule is set.

What a customer said

Glen stands behinds his work Always reasonable professional I would highly recommend glen and his team anyday my floors look brandnew After being done 3 years ago

T
toneloc howard Google review
Questions

Warehouse questions

Heavy duty coated floor in a wide industrial bay
Ask Glen directly 816-500-1161 Monday to Friday 7am to 6pm Request a Quote
Instant quote

Tell us the space. We will price it.

Four questions about the floor, then your details. Glen reads every one of these himself and comes out to measure before anything is final.

  • Free, no obligation estimate
  • Measured on site, not guessed
  • Residential and commercial
  • Missouri and Kansas
  1. 01

    You send the space

    Type, rough size and what it is used for.

  2. 02

    Glen calls back

    Usually the same working day, from the number below.

  3. 03

    He measures on site

    Then you get a fixed price, not a range.

Would rather talk it through? Call 816-500-1161, Monday to Friday 7am to 6pm.

Request a Quote

Takes about a minute.

Get the floor measured this week

Free estimate, on site, from the owner.